Below is a list of tools that were utilized for the spring semester of thesis coursework.
ANALYSIS ONE - Alternate Delivery Method
- The Gilbane Building Company
- AE 472 Notes
- Brookwood Group - this site gave me the idea of the enhanced CM @ risk method and all of the information about it
ANALYSIS TWO - Schedule Acceleration
- Gilbane Project Schedule
- Microsoft Project
- RS Means Construction Costs Data 2009
- Revit Architecture
- Microsoft Excel
ANALYSIS THREE - Mechanical Breadth
- GMU Mechanical Drawings
- Gilbane Project Schedule
- H&H Associates - provided me with fabric duct estimate
- Ductsox - this website provided me with the proper fabric system and design manual
ANALYSIS FOUR - Structural Breadth
- GMU Structural Drawings
- ICE Estimating Software
- AE 404 Notes